Project details:
- The GETRAC® A3 ballastless track system was selected for the three-kilometer stretch of line, since the twin sleepers used in this system permit a lower installation height and are particularly suited for use in tunnels
- A total of 6.3 kilometers of GETRAC® A3 ballastless track was used
- The Brandleite Tunnel is the fourth tunnel in a row that RAILONE has equipped with the GETRAC® A3 system