RAILONE expands its product range with composite sleepers as sustainable alternative to wooden sleepers
Opening of the Schwandorf plant
RAILONE inaugurates the high-tech plant for the production of turnouts in Schwandorf and Nishant Mittal takes over the role of CEO of PCM RAILONE
Acquisition of RAILONE by the PCM Group of Industries
Invention of the patented hinged turnout sleeper with subsequent receipt of the CNA Innovation Award
Start of sleeper production outside Europe
Entry heavy load - delivery of test sleepers: Development and patenting of the manufacturing process for heavy-duty concrete sleepers and testing with axle loads of up to 36 tons in the Union Pacific network (UP/USA)
Development and patenting of the RHEDA 2000® ballastless track system and introduction after initial pilot application in the DB high-speed network
Invention and patenting of the RHEDA CITY ballastless track system for tramways and metro systems, including initial applications in Dresden and Berlin
Entry into ballastless track and first reference for RAILONE in this area: system supplier through development and patenting of the RHEDA Berlin ballastless track system and participation in planning, delivery and construction of the east-west axis in Berlin (so-called light rail arches)
Use of own production technology for first foreign RAILONE sleeper production facility
First construction of a concrete sleeper plant for track and turnout sleepers in Coswig, developed and planned by RAILONE itself
Production of the first concrete sleeper in Neumarkt, Germany
development of innovative solutions for railway infrastructure and cooperation with German railway operators
Foundation of "G. A. Pfleiderer Langholzhandlung" as a long timber rafting company