Just in time for the anniversary of the Reformation in Lutherstadt Wittenberg in 2017 and the commissioning of the new long-distance connection Munich - Nuremberg - Halle/Leipzig - Berlin (VDE 8), the entire superstructure of the Hohenthurm - Peissen section was renewed. The particularly tight schedule until completion and the seasonal winter weather conditions during the construction period were particularly challenging (end of December 2016 to April 2017). The great advantage of the GETRAC® A3 ballastless track system was shown to its best in this project: even at sub-zero temperatures, installation was carried out without any problems. In addition to the track system, RAILONE also provided a wide range of planning services, including drainage planning and noise emission assessment.
Project details: